Turbidity and pH control for storm runoff from high-profile constructon site.
Drafted the initial quote for setting up and operating three Chitosan Enhanced Filtration Units to reduce turbidity of storm water runoff during Burnaby Terminal upgrades. Provided backfill coverage during the holiday season at end of 2019.